Town of Wickenburg | Wickenburg, Arizona
This project included the replacement of the existing 4-inch lines with 8-inch lines within Jefferson Street between Wickenburg Way and Yavapai Street. The project involved the replacement of existing fire hydrants and 26 service reconnections. These connections were designed and constructed in such a way as to minimize the period of time any customer would be out of water.
In addition to pre-design services, EPS Group completed design services, bid services, and post-design services, and assisted the Town of Wickenburg with the bidding of the project, reviewing bids, and making a recommendation of award. Post-Design services included construction administration and processing through Maricopa County Environmental Services Department for the Approval of Construction on this CDBG-funded project. Non-water-related services include pavement replacement for all streets, Sidewalk installation and replacement, and replacement of existing storm drain catch basins within the project area.