Farrell Road Improvements, Santos Street – Ralston Road

aerial view of newly paved intersection.

Ak-Chin Indian Community | Maricopa, Arizona

The Farrell Road project runs from Santos Street to Ralston Road that is approximately 1.6 miles of a paved two-lane road. A significant wash, Vekol Wash, runs through the project area. EPS Group is

Town of Marana Police Facility

image of a modern building with glass features showing the police facility.

Town of Marana | Marana, Arizona


The new Marana Police Facility is a state-of-the-art building that spans 42,000 square feet and features an indoor shooting range, a gym, a virtual training room, K-9 facilities with kennels, and expanded storage and

Celgene Corporation Renovations

Celgene Corporation | Phoenix, Arizona

The Celgene Corporation entry and site development renovations were designed to enhance the overall identity of the Celgene Corporation. The landscape and hardscape enhancements complement the proposed architecture of the new 40,000 square foot cafeteria

Saguaro Bloom

Entry monument of Saguaro Bloom master-planned community in Marana, Arizona.

DR Horton | Marana, Arizona


Saguaro Bloom is a sprawling, 700-acre master-planned community located in the town of Marana, Arizona. At EPS Group, we were thrilled to provide surveying and engineering services for both preliminary and final platting, as well

Sage Memorial Hospital Master Plan

Razaghi Healthcare | Ganado, Arizona

EPS Group is currently providing civil engineering and landscape architecture masterplanning design services for this state-of-the-art 117-acre medical/healthcare master-planned community on the Navajo Nation in Ganado, Arizona. The plan addresses all design aspects including roadways,

SR 347 UPRR Grade Separation Final Design

Arizona Department of Transportation / City of Maricopa | Maricopa, Arizona

EPS Group completed the DCR, EA, and final design for the $55 million grade separation of State Route 347 over the Union Pacific Railroad (UPRR) tracks in historic downtown

Banner MD Anderson Cancer Center

Banner Health | Gilbert, Arizona

EPS Group provided a variety of services for the new 150,000 sf Banner MD Anderson Cancer Center. As a site retrofit on portions of the Banner Gateway Medical Center campus, engineering efforts included master plan

I – 40/US – 93 West Kingman TI DCR & PEL

I-40 / US 93 West Kingman System Traffic Interchange – Design Concept Report (DCR) and Environmental Assessment (EA) | Kingman, Arizona

ADOT’s Interstate 40, West Kingman Traffic Interchange (TI) serves as a primary link between Phoenix and Las Vegas, Nevada.

Construction Management

A blue circle icon with a white line design of a construction person reading plans to symbolize Construction Management.

Our construction managers utilize the latest technology solutions to provide continuity in cost control, scheduling, design alternatives, and feasibility. Our project management leaders deliver reliable results, and we guide our residential, industrial and public works clients from design conception through …

Water Resources / Drainage

A blue circle icon with a white line design of a water drop with an arrow to show circulation to symbolize Water Resources.

EPS Group engineers utilize the latest water resource technologies and lessons learned from the development of miles of water, reclaimed water and sanitary sewer facilities. We provide proven solutions to challenging water/wastewater engineering projects. Our expertise includes irrigation/floodplain analysis and …