Valley Metro Light Rail – Gilbert Road Extension: The Gilbert Road Light Rail Extension project is a 1.9-mile track addition to the existing line along Main Street in downtown Mesa.
A four-way roundabout, the first of its kind in the …
Valley Metro Light Rail – Gilbert Road Extension: The Gilbert Road Light Rail Extension project is a 1.9-mile track addition to the existing line along Main Street in downtown Mesa.
A four-way roundabout, the first of its kind in the …
EPS Group completed the final design of Lindsay Road from Pecos Road to the SR 202. This six-lane major arterial roadway with raised medians is a critical piece in resolving traffic issues associated with …
EPS Group was selected for the repair or replacement of 22,230 linear feet of concrete and vitrified clay sanitary sewer mains, laterals and brick manholes that …
This project won the 2019 Metropolitan Pima Alliance Common Ground Award and APWA, Arizona Chapter Southern Branch – 2020 Project of the Year, Transportation (5-25 million range).
The Pima County …
Dove Mountain K-8 Computer Science, Technology, Engineering, and Math (CSTEM) School
Marana Unified School District | Marana, Arizona
As the first K-8 CSTEM school in Arizona, this new 102,000 SF, combined elementary and middle school is located on a 20-acres …
The Arizona Department of Transportation (ADOT) selected EPS Group to prepare a Design Concept Report (DCR) evaluating a potential grade separation of SR 347 over …
The SanTan Motorplex is a 150-acre auto mall and is the largest auto mall in the state of Arizona. Its frontage along the freeway allows passing motorists to view the large signage located at …
Highland Groves is a vibrant subdivision located in the eastern part of Gilbert, Arizona, spanning over 143 acres of land and consisting of 457 lots. This subdivision is an integral part of …
Rivulon is a premier master-planned mixed-use development located in Gilbert, Arizona, spanning approximately 230 acres. The community offers a unique blend of retail, commercial, and residential spaces that have been thoughtfully designed to create …
EPS Group was responsible for providing civil engineering, topographic surveying, ALTA surveying, platting, and construction staking services for the Gilbert Arizona Temple. The 85,000 SF temple is situated on a