Wintersburg Parkway Feasibility Study

Maricopa County Department of Transportation | Buckeye, Arizona

EPS Group was selected by MCDOT to complete this 22-mile Corridor Feasibility Study within the MAG Hassayampa Framework Study area. The corridor alignment passed through numerous MPCs (Master Planned Communities) and across

City of Chandler General Plan

City of Chandler | Chandler, Arizona

EPS Group was actively involved in the consensus building effort of the City of Chandler General Plan for a community of more than 236,000 residents. We worked with the team to implement the public

US-70 Salt Creek Emergency Repair

Arizona Department of Transportation | San Carlos, Arizona

Sometime in the Fall of 2006, Salt Creek experienced a major drainage event that crushed most of the 3-15’ diameter corrugated plate pipes intended to pass its flow under US 70. The

Camino De La Canoa Water Line

Farmers Water Company | Sahuarita, Arizona

The project included design and construction documents for 4,000 linear feet of 12-inch water transmission line. The new line provided the water supply for a small stand-alone water system. A Pressure Reducing Valve (PRV)

Farmers Water Company Well E-11A

Farmers Water Co. | Sahuarita, Arizona

EPS Group assisted the water company in converting an irrigation well to a production well for potable water use within the water company. We prepared plans to make the necessary improvements and bring the

Sahuarita Highlands Water Storage Tank

Large, tan water tank.

Farmers Water Co. | Sahuarita, Arizona

The project included design and construction documents for a second 200,000-gallon above-ground welded steel water storage tank. The design included on-site piping, pump selection and layout, water storage, and associated piping, valves, and site

White & Parker Major Investment Study

City of Maricopa | Maricopa, Arizona

The City of Maricopa selected EPS Group to complete a Major Investment Study (MIS) for a proposed grade-separated interchange that combines three Arizona Parkways with three arterial streets over four sets of Union Pacific

MAG Road Safety Assessments

MAG | Tempe, Scottsdale, Phoenix, Glendale, Arizona

EPS Group conducted road safety assessments for various high priority intersections for Maricopa of Governments (MAG) including:

  • Hardy Drive & Baseline Road | Tempe, AZ
  • Scottsdale Road & Thomas Road | Scottsdale, AZ

ADOT On-Call–I-40 Lupton TI DCR

Arizona Department of Transportation | Lupton, Arizona

EPS Group prepared a DCR and Draft EA of the existing Lupton Diamond TI on Interstate 40. The Lupton interchange experienced significant operational challenges due to inadequate structural clearance (13’11”), proximity of two-way

Jackrabbit Trail Candidate Assessment Report

Maricopa County Department of Transportation | Phoenix, Arizona

MCDOT selected EPS Group to complete a one mile CAR (similar to a mini-DCR) evaluating potential improvements toJackrabbit Trail between Van Buren Street and McDowell Road. A variety of traffic models were