Town of Wickenburg | Wickenburg, Arizona
The project included design and preparation of plans and specifications for the construction of approximately 3,500 feet of existing water main on Country Club Drive from Chuckwagon Trail to Orient Drive and a portion of Horseshoe Trail. The project also included 13 waterline easements and eight temporary construction easements. This line was constructed to replace antiquated 2-inch and 4-inch water lines on private property with no easements or right-of-way. The team reconnected 16 water services to the new line as part of this project. In addition to pre-design and design services, EPS Group assisted the Town of Wickenburg with bidding of the project, reviewing bids, and recommendation of the award.